Friday 16 November 2012

Tiles being loaded onto the roof!

Drove past this morning early on and, even though it was raining a little more than a drizzle, I noticed a ute outside, unloading what could only be the roof tile conveyor belt system.

Dropped in at the end of the day, and found they've prepped the entire roof - sarking laid, and support beams nailed into place. And about half the roof has been loaded up ready for tile laying.

Maybe they're hoping to lay on a Saturday? Time will tell. (ps: they did!)

Some shots of the tile conveyor belt

Some shots of the RHS and LHS tile stacks


Front tile stacks


From the rear


Internal views